Recent Projects

Client
Heathrow Airport Hanger Refurb
Location
Category

Project Overview

As part of British Airways increase its aircraft fleet and with the addition of the new A380 air bus and the new Dreamliner’s, the existing 1970’s TBJ Hangar required alterations and refurbishment to cater for scheduled maintenance of British Airway’s new aircraft fleet.

The hangar has largely remained the same but needed a radical solution to allow the new fleet of aircraft to undergo scheduled maintenance to maintain flying. Through an understanding and feasibility study two cantilevered nose pods have been installed to increase the effective depth of the hangar with minimal changes to the interior creating a cost saving solution for British Airways.

Achievement

As part of British Airways increase its aircraft fleet and with the addition of the new A380 air bus and the new Dreamliner’s, the existing 1970’s TBJ Hangar required alterations and refurbishment to cater for scheduled maintenance of British Airway’s new aircraft fleet.

As part of British Airways increase its aircraft fleet and with the addition of the new A380 air bus and the new Dreamliner’s, the existing 1970’s TBJ Hangar required alterations and refurbishment to cater for scheduled maintenance of British Airway’s new aircraft fleet.

As part of British Airways increase its aircraft fleet and with the addition of the new A380 air bus and the new Dreamliner’s, the existing 1970’s TBJ Hangar required alterations and refurbishment to cater for scheduled maintenance of British Airway’s new aircraft fleet.

Project Gallery

Explore More Projects

Surrey County Council Office Revamp

Contemporary Mansion

Heathrow Airport Hanger Refurb